%20590.JPG) |
| The diamond is out and a piece of flextrack is in place. The back track will need some support underneath and also the foreground trackage needs to be figured out. |
I spent a couple of hours downstairs last month during a humid day and finally tore out the diamond. I cut in a switch which take the trains into the yard via a different route. Nothing is actually attached as I wanted to see where the roadbed needs to be first. I did not have to destroy much of the layout to get a new look to this area...George Dutka
%20590.JPG) |
| A bit of work will have to be done to get some plywood into the locations that need trackage. |
Hi George. Do you have a before photo of the diamond?
ReplyDeleteYes I do will post
ReplyDelete