![]() |
A test run of the second unit found in Bellows Falls yard. |
It has been a long time since I ran any trains on the WRD. When I did the scenery work for the ITLA shed I needed to move a train. I think I cleaned the tracks here back in the early winter but did not run any trains in the Bellows Falls yard. So a quick track cleaning prior to some train movements through the yard. Although train operations lasted maybe 15-20 minutes it was fun.
The last while I have been more focused on building models...especially since covid lock-down. In the past Peter Mumby would be over on Mondays and we would fool around with some engines or trains, which kept the WRD active...George Dutka
![]() |
Scenery work is done and the B&M local has been shoved back into the yard. A cut is being made before a double over to the next track. |
No comments:
Post a Comment