Monday, 7 September 2026

WRD - Diamond

Part of the trackage is roughly laid in place. I need to hook up the back spur then work on cutting some roadbed from plywood to fit the areas.
Have not done much with the diamond location lately. Weather is too nice for me to be in the basement...George Dutka

The back switch to the spur is set into place, Once the flex track is cut to fit into the scene I will be working on tearing out the scenery and installing some plywood roadbed.

Another angle at were things stand at the moment.


No comments:

Post a Comment