Sunday, 15 July 2018

Paris Jct. Visit 2018

Paris Jct. Section house. I am thinking the signals depart
On our way to the Rapido open house and BBQ Peter and I stopped at Paris Jct. for a look and maybe catch a train. Well all we found was an interesting pick-up truck behind the section house. A truck was also being loaded in the parking lot and the structure has been updated with a crossing signal erected outside the front door...George Dutka



A close-up look at the new addition to the section house.

No comments:

Post a Comment