Monday 26 June 2023

Ice House Remodel

The Walthers ice house was chopped down by at least a third. A new roof was required as it was a mess of glue and cracks with missing parts.
Working away on my Hoods creamery diorama.  I finished the ice house first which is a chopped down HO Walther model. I thought I would show you the finished model first. I will follow-up with a look at the construction shortly...George Dutka

Two of the side wall doors are cut in half and applied at locations were a mess of glue was originally found once the model was pulled apart and cut.

A new wooden foundation is applied along with wooden corner trim. AK weathering stains are used along the lower area of the model.


No comments:

Post a Comment