Sunday, 25 February 2024

CV Cabooses

The siding is being installed during the fall of 2011 inside the shop. The caboose had been stripped down to a shell. 
I stopped in at Willimantic back in 2011 to visit the museum there. The CV center cupola caboose was looking really good with new siding being applied. The interior was still a mess though but being worked on. I have never got back to see the final product, but a trip I hope is in my future...George Dutka  

No comments:

Post a Comment