Welcome, follow along with George Dutka in his journal which documents the additions and future thoughts for the HO scale White River Division model railroad and to his continuing historical New England railroad research. The White River Division is now in its 19th modeler's season. The "modeler's season" runs from November to April each year. Inspiration comes from the Boston and Maine, Rutland and Central Vermont Railway during the 1950's with extra posts by Don Janes and Keith MacCauley.
Wednesday, 4 September 2013
Friday, 30 August 2013
Westboro Sand House
I had to attend a wedding last weekend and found some time during both Saturday and Sunday to work on my sand house kit. I actually got a lot done. Here is a view of it as it looks at the moment. It is almost done, although I still need to build the drop in base. Have a great long weekend...George Dutka
Wednesday, 28 August 2013
Tuesday, 27 August 2013
Search this blog...feature added
With over 340 posts on this blog Marty mentioned I should have a search window for easy referrals. I did not know there was such a feature. Marty talked me through adding this feature. One can now find the search feature on the sidebar. All one needs to do is type what you are looking for and a list appears at the beginning of the blog...many thanks Marty...George Dutka
Monday, 26 August 2013
B&M RS-3's
![]() |
| My two RS-3's are seen working at Bellows Crossing on the White River Division. The engines are new deliveries and have yet to see much of the railroads right-of-way grime. |
Stock Bachmann B&M RS-3's...getting some additional details
I started adding a few details to my two B&M RS-3's back in the late spring. With the early July hot weather keeping me in a cool place I finished the details and light weathering of my two units. There are more details that one could add if one wished to, I just wanted to add enough to make the engines my own creation. The RS-3's are great right out of the box, but a few easy add-on's sure makes a big difference. You can check out my Jan. 25th, 2013 post regarding their arrival at WRJ.
B&M 1536
The easiest jobs are to add wipers to the windows which are painted Floquil old silver and marker lights to the lead end. Markers are Precision Scale part #31334 which are painted black. This part of the project is very easy, just requiring drilling a few holes and painting the castings. Just these two changes really makes a big difference. The horn on my engine is wrong for a B&M engine and also in the wrong location. I broke mine off and touched up the markings with engine black. I mounted mine on the cab roof as seen in the photos. The bracket and horn are from my parts box. I also added lift rings by Detail Associates #1107 to the hood removing the cast on originals. All are touched up with Floquil engine black.
Both engines got Kadee True Scale No. 58 couplers. This is was not an easy job. The Kadee brass holder does not fit properly. I reamed out the hole in the brass to make it fit. One could also drill these out. Getting it all back together and operational took me over an hour per engine. For some reason the second engine took me longer than the first. I am glad I changed out the couplers as they do make a big difference in appearance.
![]() |
| B&M #1538 began as stock engine 1536 but had the 6 changed to an 8. |
Once I finished with all my add-on's, I gave the whole engine a coat of Floquil Flat finish. Following this I used chalks and Bragdon weathering powders to give them a lightly used appearance. I may add more weathering to the trucks at a later point but I wanted them to be more as if they where recently delivered. The marker jewels are then applied.
B&M 1538
The detailing and weathering on engine 1538 was identical to 1536. Both of my engines came numbered the same, B&M 1536. I needed a part number change on this engine. I began by touching up the number 6 on the body with Scalecoat S2123, B&M maroon. I did the same on the number boards and ends using Floquil engine black. I now needed to find a similar looking number 8. For the numbers I used Microscale B&M E & F units sheet #87909. The numbers although not an exact match are very close. This engine got a horn I still had packaged, it is Details West #AH-253, all other parts are the same as on 1536...George Dutka
Wednesday, 21 August 2013
Thursday, 15 August 2013
New Brushes
I use two set of paint brushes in my modeling. My best and finest pointed brushes are used for model painting. The other group are a cheap set of brushes used for weathering my buildings and rolling stock.
Back in July I picked up a new set of brushes for weathering. These I will use strictly for my chalks and powders while weathering my structures and rolling stock. The cheap dollar store brushes I had been using seem to wear out very quickly as I seem to do a lot of rubbing and scrubbing to get the powders into the grooves and corners. My next few project will tell me if there is any difference...George Dutka
Wednesday, 14 August 2013
Wednesday, 7 August 2013
Friday, 2 August 2013
Saving the Pumpkin Patch Scene
![]() |
| The White River Division pumpkin patch and barn insert has been saved for later use. |
When I began the tear down process of the White River Division (not the whole layout but areas that needs reworking for point to point operation) a few of the scenes did get saved for future use. The pumpkin patch and barn scene has been removed intact and mounted on a piece of Gatorfoam. Once I have time the edges of the scene and the patch will get some refreshing...ground foam and so on. At some point a new location will be found and it will be re-installed on the layout...George Dutka
![]() |
| The barn is set in place on the saved scene. |
Wednesday, 31 July 2013
Sunday, 28 July 2013
A Vermont Barn Along Route 5
![]() |
| This scene would look great either in the background of a layout or close to the foreground to hide the trackage heading into another room or scene. |
![]() |
| This is a road side view of the property. I really like the look of the metal roofing which could be duplicated in model form. |
![]() |
| The garage is located across the road from the barn and home. I have run across this a lot throughout New England. |
Saturday, 27 July 2013
What's in the Box? - No. 2
![]() |
| All the packages and parts are seen along with the plans, photos and instructions. |
RailroadKITS
B&M Westboro NH Sand House
One of the scenes I am planning to add to the White River Division during reconstruction is a small peninsula that will connect to WRJ. It will be a few shop tracks and structures found near the B&M Westboro engine house. Although I will not have space for the roundhouse and turntable I thought of adding the diesel fuel track, sand house that is seen above, sand loading tower, section house, station and the other small structures found near by. Westboro was a compact facilities. I have already measured the station and section house for future construction. Westboro will make a nice spot to display my fleet of B&M-CPR engines when not in use.B&M Westboro NH Sand House
The sand house kit is another offering by RailroadKITS that I purchased last fall at the Lancaster Expo. It was originally released by White River Structures of Granville, OH. They mention in the instructions that the structure was built around 1904 and used into the early 1970's. It appears to still hold a third of its original sand and for some years was used for paint ball practise by weekend warriors. Today it is surrounded by a high fence and well secured.
The kit comes with two great photos that will be helpful, a set of plans (6 pages) including a location page for all the parts full size. The instructions are lengthy, 14 pages. The original kit (or early releases) has laser-cut walls and lumber by Northeastern Scale Lumber, not sure what RailroadKITS are using now. My kit's wood looks great.
The windows appear to be Grandt Line and the other metal parts Alexander Scale Models. Ladders and walks are from Central Valley. A package of sand is also included. The roof material is flimsy and will be changed out with styrene. Also the tar paper roofing will be switched with BEST roofing.
The kit looks like a good build that should not have many problems. I have already figured out all the assembly steps by just using the drawing and part location sheets. I will fill you in this fall with how it went together once I have a finished model...George Dutka
![]() |
| The Westboro sand house during the fall of 2011. The structure is now secured behind fencing. |
Wednesday, 24 July 2013
Monday, 22 July 2013
Colourful Boxcars of the 1950's
![]() |
| One of my NH orange 40' boxcars is seen near the tail end of a CPR train which is nearly all boxcar red. |
After reading the posts I took a look through my pictures to see how I actually felt about my own group of colourful boxcars that do operate over the White River Division. I think they look right at home along with all my other rolling stock. What do you think...George Dutka
![]() |
| A Kadee model PS-1 B&M blue boxcar is trailing a new CV arrival in the late 1950's. |
![]() |
| A NH black boxcar with an orange door and full size herald is seen next to an earlier era wooden caboose on a WRD B&M train. |
![]() |
| An older B&M S-2 Alco handles a Rutland Ry. modern era boxcar in this mid 1950's scene. |
![]() |
| A string of colourful reefer are seen awaiting departure in White River Jct. |
Friday, 19 July 2013
WRD Tear Down Process
![]() |
| The left portion of this photo views the area that once was the hidden staging. It will become the foreground once completed. |
![]() |
| Looking into White River Jct. yard from the point that once was the duck under. As you can see a lot was removed from this area. The WRJ yard will be built along the rear wall which once was staging. |
Wednesday, 17 July 2013
Green Mountain Division Expansion - Update...by Don Janes
| Two freight trains are tucked away in two of the three staging tracks I recently completed. Note the smooth flowing lines of the curved turnouts....photos by Don Janes |
Staging Tracks Complete
Since my last post I have built five turnouts and finished installing the three long staging track along the north wall of the layout. The two inside tracks will hold a total of twenty cars, including locomotives and caboose and the one along the wall about twenty five cars. I could also stage two shorter trains in one track. To get the most out of my available space I decided I would need to build curved turnouts leading to and at each end of the staging tracks. I have been using Fast Tracks products for quite a long time and decided to use their Twist Tie turnout tie sections for all the curved turnouts. These sections are designed to be flexible and bent to fit your track arrangement. They have pre-drilled spike holes and laser cut scribed lines where the rails are to be placed making scratch building turnouts a dream. They come in several different frog angles for both right and left turnouts. For this project I used two # 8 right hand, one # 8 left hand and one each of # 7 right and left hand tie sections. The resulting track work is smooth flowing and extremely reliable. Check out the Fast Tracks web site for their complete product line. http://www.handlaidtrack.com/
Once all the turnouts and track were installed I added Tortoise switch motors. The main power bus is #14 solid copper wire.(14-2 house wire) I dropped down smaller gauge track feeder wires at about four foot intervals to keep a good electrical flow to the track. For years I have seen articles about using "suitcase connectors" for connecting feeders wires to the main track bus wires but this is the first time I have tried using them. Let me tell you, they are great. Fast and clean. No more crawling around under the layout soldering feeders while laying on my back. I would highly recommend these to anyone doing any track wiring. I bought mine from Micro Mark but they can be purchased at numerous places including Princess Auto.
After all the wiring was done I built a temporary control panel for the switch machine switches so I could test run the trains through all the turnouts and staging tracks. Everything seems to work as planned so now its on to designing the rest of the layout track plan.
Once all the turnouts and track were installed I added Tortoise switch motors. The main power bus is #14 solid copper wire.(14-2 house wire) I dropped down smaller gauge track feeder wires at about four foot intervals to keep a good electrical flow to the track. For years I have seen articles about using "suitcase connectors" for connecting feeders wires to the main track bus wires but this is the first time I have tried using them. Let me tell you, they are great. Fast and clean. No more crawling around under the layout soldering feeders while laying on my back. I would highly recommend these to anyone doing any track wiring. I bought mine from Micro Mark but they can be purchased at numerous places including Princess Auto.
After all the wiring was done I built a temporary control panel for the switch machine switches so I could test run the trains through all the turnouts and staging tracks. Everything seems to work as planned so now its on to designing the rest of the layout track plan.
| These are the turnouts just after the track enters the new room. The turnout on the right is for a future spur track and the one on the left leads to the new staging tracks |
| Here we see the opposite end of the staging tracks with a #8 right hand turnout. |
| I have started using "suitcase connectors" for my drop down track feeders and Tortiose switch motors. These make wiring a dream. |
Saturday, 13 July 2013
Johnsonville, NY - Tower Model
A few weeks ago the NEW&B Facebook page mentioned a model of the prototype Johnsonville Tower was available. As noted on the kit page "The prototype is located in Johnsonville, New York at the former junction of the Boston and Maine Railroad’s (B & M’s) East-West Mainline and its Troy, New York Branch. Not only was this junction home to B & M freight and passenger trains making connections to the New York Central Railroad over the Troy Branch, but it was also frequently used by the Delaware and Hudson (D & H) and Rutland Railroads. Johnsonville Tower was built in 1931 as part of the B & M’s initial investment in Centralised Traffic Control (CTC) and was retired in 1962 when CTC functions were further consolidated into Greenfield, Massachusetts. This tower was used for storage until the mid-1970's when it was abandoned."
The kit is available from N Scale Architect for just under $80. Link to the kit is below...George Dutka
Friday, 5 July 2013
B&M - Johnsonville, NY
![]() |
| A track side view of the station. Note the concrete platform is still in place. |
![]() |
| Looking east at the rear and west wall. It is currently a home. |
![]() |
| A look west towards the tower from the station. |
![]() |
| The tower is in poor shape. |
Wednesday, 3 July 2013
Subscribe to:
Posts (Atom)

































