Friday, 28 November 2025

MEC Bangor Yard Tower

The back wall got a ladder to the roof a downspout and electrical box. 
Once I was done with the basic construction I went back and added some details to the two walls one does not see as they are pretty plain. I added downspouts leftover from the back alley build ITLA and a ladder to the roof. I could not find one with a cage around it which would have been better, but that can be changed out in the future. I also added a ITLA electrical box and a Mini Prints 3-D printed gas meter. All for now...George Dutka

Downspout, 3-D gas meter, some piping and weeds.

All done for now! 



No comments:

Post a Comment