Saturday, 16 January 2021

FOS - Kit of the Month

 

My finished structure with a variation in the roofing.

Another FOS kit-of-the-month is now completed. The captions tell the story of what I did...George Dutka 

The back wall is together but the front wall is mainly doors.

The doors being assembled.

Doors ready to go in place.

I would have liked to model the doors open but they needed to be closed and braced to hold the structure together.

Ready for stain and powders.

Hunterline stain and Floquil grime is applied. The tar-paper is painted acrylic black.

The roofing is being installed. Note the bracing to the front doors. Even after the two braces for each set of doors an extra piece needed to hold the two together.


No comments:

Post a Comment